Maintenance Progress for
Los Angeles Equestrian Center
Barn Projects Completed Overview
ABC Barn area:
- Gutters cleaned in all 3 barns
- 36 stalls repaired - leveling of ground, mats, painting of walls, replacement of wood, replacement of feeders and waterers, and reconfiguration
- Repair and leveling of ground from rain
- Repair of shavings bay gates
DEF Barn area:
- Repaired shavings bay
- Parking area and around the barns leveled w/ DG
- Removed weeds
- 20 stalls repaired with DG, pipe stalls secured w/ footings, replacement of wood and waters and feeders
- TES arena had the sand pulled from the sides and was leveled
- TES arena weed removal around the perimeter
- Trees were trimmed, palms pruned and fallen trees replanted
Polo Barn Area:
- 30 stalls refurbished w/ new wood and leveled w/ DG
- all aisles and surrounding areas were repaired with DG and releveled
- Removal of dead trees near RV parking
Maintenance Team: Removal of trash/debris & Repairs
- Leveling and addition of DG of maintenance area
- Alfalfa containers relocated to the maintenance area
- Cleanup of dirt parking lot
- Moved the location of roll-off bins
- Cleaned up trash/debris
- Rebuilding of the main archway before painting
- Repair of archway light
- All carts and alfalfa tracks are on a pm for weekly service w/ brake and battery checks
- Relocation of staff lockers to a centralized location at the maintenance area
- Replacement of pumps in ballroom fountains
- Repair of historic “Little White House”
- Hoisting of new American Flag on Hunt Field
- Replacement of 87 fire extinguishers
- AED contract with Cintas
- Fuel pump repaired
- Refurbishment of former barn manager office with the removal of a tree that was damaging the building
- Updated ansul fire suppression systems in kitchens
- Compressor replacement in progress in refrigeration
- Gas leaks are being identified and repaired in kitchens
Horse Show Barns, Area & Equidome:
- Equidome roof leaks repaired
- Equidome arena leveled and footing replaced
- Equidome and show arenas made available for boarder and trainer use on a daily basis
- All areas cleared of weeds
- Aisleways and entire area repaired from rain leveled with DG
- Magnets over the entire site to remove any nails, screws & metals
- Swapped footing in all arenas
- Tree was removed near Rein Cafe to remove concrete and repair a large leak, which has been an issue for years
- On-going repairs, including roof replacement on Rein Cafe to make it functional once again