Maintenance Progress for
Los Angeles Equestrian Center

Barn Projects Completed Overview

ABC Barn area:

- Gutters cleaned in all 3 barns

- 36 stalls repaired - leveling of ground, mats, painting of walls, replacement of wood, replacement of feeders and waterers, and reconfiguration

- Repair and leveling of ground from rain

- Repair of shavings bay gates

DEF Barn area:

- Repaired shavings bay

- Parking area and around the barns leveled w/ DG

- Removed weeds

- 20 stalls repaired with DG, pipe stalls secured w/ footings, replacement of wood and waters and feeders

- TES arena had the sand pulled from the sides and was leveled

- TES arena weed removal around the perimeter

- Trees were trimmed, palms pruned and fallen trees replanted

Polo Barn Area:

- 30 stalls refurbished w/ new wood and leveled w/ DG

- all aisles and surrounding areas were repaired with DG and releveled

- Removal of dead trees near RV parking

Maintenance Team: Removal of trash/debris & Repairs

- Leveling and addition of DG of maintenance area

- Alfalfa containers relocated to the maintenance area

- Cleanup of dirt parking lot

- Moved the location of roll-off bins

- Cleaned up trash/debris

- Rebuilding of the main archway before painting

- Repair of archway light

- All carts and alfalfa tracks are on a pm for weekly service w/ brake and battery checks

- Relocation of staff lockers to a centralized location at the maintenance area

- Replacement of pumps in ballroom fountains

- Repair of historic “Little White House”

- Hoisting of new American Flag on Hunt Field

- Replacement of 87 fire extinguishers

- AED contract with Cintas

- Fuel pump repaired

- Refurbishment of former barn manager office with the removal of a tree that was damaging the building

- Updated ansul fire suppression systems in kitchens

- Compressor replacement in progress in refrigeration

- Gas leaks are being identified and repaired in kitchens

Horse Show Barns, Area & Equidome:

- Equidome roof leaks repaired

- Equidome arena leveled and footing replaced

- Equidome and show arenas made available for boarder and trainer use on a daily basis

- All areas cleared of weeds

- Aisleways and entire area repaired from rain leveled with DG

- Magnets over the entire site to remove any nails, screws & metals

- Swapped footing in all arenas

- Tree was removed near Rein Cafe to remove concrete and repair a large leak, which has been an issue for years

- On-going repairs, including roof replacement on Rein Cafe to make it functional once again